Wet Down the Tunnel


Use these steps to wet down the wash tunnel. This is normally done at the open of business, before the first vehicle is washed.

  1. Log in to the tunnel application.
  2. Select Hardware. The Hardware panel opens.

  1. In the Tunnel section, select Wet Down. The tunnel wet down function activates and a Wet Down override sent confirmation message briefly appears at the top of the tunnel entrance terminal.